Canada’s second-largest pension fund has purchased shares in Fairview Terminal.

Prince Rupert’s Fairview Terminal expansion reaches milestone

DP World Fairview Container Terminal Phase 2 reaches 75 per cent completion milestone

The Port of Prince Rupert and DP World today announced a significant milestone in the ongoing expansion of Fairview Container Terminal.

The Phase II North container terminal expansion project, launched in the first quarter of 2015, is now more than 75% complete and is on schedule to increase annual capacity at Prince Rupert’s container terminal to over 1.35 million TEUs by the third quarter of 2017.

“Prince Rupert’s container business has experienced rapid growth since the opening of Fairview Container Terminal. This project is the continued evolution of our fast and reliable trans-Pacific service,” said Don Krusel, President & CEO of the Port of Prince Rupert. “The expansion of our intermodal operations answers growing interest from North American shippers that are capitalizing on the Prince Rupert advantage.”

Fairview Container Terminal anchors one of the west coast’s most efficient trade lanes, served by CN’s North American Class 1 railroad, providing extensive reach into major markets in Canada and United States. The expanded terminal will include a second deep-water berth, three additional gantry cranes, and land reclamation to further expand the container yard. On-dock rail capacity will also be expanded by densifying the current track configuration, which will be supported by a rubber-tired gantry crane operation.

“Prince Rupert’s success has been driven by its unparalleled geographical position on the Trans-Pacific trade route, high terminal productivity, and consistent low dwell times that have sustained despite our significant growth in throughput over the past two years,” said Maksim Mihic, General Manager, DP World (Canada) Inc. “Strong relationships with our partners ILWU locals, Port of Prince Rupert and CN Rail have resulted in a reliable and competitive service for our customers.”

The next significant milestone for the project is expected in March 2017 with the arrival of three Malacca-max dock gantry cranes to make Prince Rupert big ship ready. Each crane is equipped with a reach of 25 containers wide and is capable of working the largest vessels in the world with a carrying capacity of 20,000- plus TEUs.

 

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Stop checks, searches of Wet’suwet’en pipeline opposers unlawful: Watchdog

Wet’suwet’en hereditary chiefs, the B.C. Civil Liberties Association, Union of B.C. Indian Chiefs file complaint

Wet’suwet’en pipeline supporters speak up

“Protesters get one side of the story and they stand up with their fists in the air.”

Bachrach rejects calls for police action against demonstrators

Skeena-Bulkley Valley MP says only way out of crisis is “true nation-to-nation” talks

Coast Mountain College appoints a new president

The promotion came from within the school

Coastal GasLink pipeline investor committed to closing deal despite protests

Developer TC Energy Corp. — formerly TransCanada Corp. — is to remain the operator of the $6.6-billion pipeline

Blair says RCMP have met Wet’suwet’en conditions, calls for end to blockades

The Wet’suwet’en’s hereditary chiefs oppose the Coastal GasLink project

Health officials confirm sixth COVID-19 case in B.C.

Woman remains in isolation as Fraser Health officials investigate

Study says flu vaccine protected most people during unusual influenza season

Test-negative method was pioneered by the BC Centre for Disease Control in 2004

Saskatchewan and B.C. reach championship round at Scotties

British Columbia’s Corryn Brown locked up the last berth in Pool B

B.C. lawyer, professor look to piloting a mental-health court

In November, Nova Scotia’s mental-health court program marked 10 years of existence

COLUMN: Not an expert on First Nations government structures? Then maybe you should calm down

Consider your knowledge about First Nations governance structures before getting really, really mad

One dead in multi-vehicle collision involving logging truck on northern B.C. highway

DriveBC says highway expected to remain closed until 8 p.m.

B.C. teacher gets 15-year ban after lying about having sex with just-graduated student

Teacher had been dishonest with the B.C. Commissioner for Teacher Regulation

Pipeline talks got B.C. railway open, can work again: Horgan

Premier says protest excesses damage Wet’suwet’en case

Most Read