Undersea cable pitched for clean energy

A company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids

Wind farm development in northeastern B.C. Proponents of a new power line between Vancouver Island and Washington say it would make wind power a more stable source.

VICTORIA – With BC Hydro struggling to control electricity rate increases and cutting back on private power acquisition, a company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids.

Sea Breeze Power Corp. wants to build a 50 km transmission cable under the Strait of Juan de Fuca to connect substations near Port Angeles and Victoria. To finance the project, it’s looking for a 10-year deal to assemble surplus U.S. power and sell it to BC Hydro at a flat rate of $69 per megawatt hour.

Sea Breeze CEO Paul Manson said the power purchase would finance the construction of the cable and deliver a steady source of electricity to B.C. at lower cost than new sources built in the province. It would also improve power quality and reliability for Vancouver Island residents, he said.

First proposed in 2006, the project has received environmental permits from both sides of the border. It was rejected by the B.C. Utilities Commission, which approved upgrading the existing power line from the B.C. mainland to Vancouver Island instead.

Sea Breeze developed a wind project at Cape Scott on northern Vancouver Island, and has plans and permits for other wind sites on the B.C. coast and the Peace River region. Manson said the Juan de Fuca cable would stabilize wind power supply on the B.C. coast, where wind speeds peak in winter, with inland Washington sites where it’s windiest in summer.

Manson said U.S. policy led to major wind development that leaves the the Pacific Northwest with an excess of power in spring, meaning the Washington power utility has paid BC Hydro to take its excess when hydro dams are full.

The cable would also give B.C. more capacity to buy cheap overnight coal and nuclear power from the U.S., which BC Hydro already does with its main connecting line along Interstate 5, he said.

Energy Minister Bill Bennett said the Juan de Fuca cable is one of many proposals that came forward as BC Hydro developed its integrated resource plan. That plan estimates that with conservation and efficiency improvements in B.C., the province will need more electricity supplies within eight years.

The company has not yet demonstrated that it can assemble the firm electricity it proposes to sell, and the project has “a pretty steep slope to climb,” Bennett said.

 

Just Posted

EXCLUSIVE | Ron MacLean on Prince Rupert: “A kaleidoscope for the eyes”

Rogers Hometown Hockey host on Canucks, B.C.’s First Nations story and hockey’s new reflection phase

EXCLUSIVE: Kirk McLean on first time in Prince Rupert, changing nature of goaltending and Canucks outlook

Alex Kurial caught up with legendary Vancouver Canucks goaltender at Rogers Hometown Hockey

Adverse weather conditions lead to pair of ferry cancellations

Northern Expedition sailings from Prince Rupert and Skidegate affected

Rink ready, for the Rampage, minor hockey and more

Plenty of maintenance work ensures the Civic Centre’s ice surface is in pristine condition

EXCLUSIVE: Slone on Prince Rupert, working with MacLean and women in sports

Tara Slone, host of Rogers Hometown Hockey, sat down with reporter Alex Kurial for an interview

WEB POLL: Is hockey part of your identity as a Canadian?

Prince Rupert is Hometown Hockey! Is the sport part of your national identity?

The Northern View presents Santa Shops Here in Prince Rupert

More reasons to spend your shopping dollars locally

Fireballs to fill the sky Friday for brightest meteor shower of the year

Geminid meteor shower features colourful, brighter, longer shooting stars

Province sues over sailing incident that killed teen with disabilities

Gabriel Pollard, 16, died from injuries after marine lift failed

First Nations want Big Bar landslide cleared ASAP to allow fish passage

Leadership calling for urgent action and resources to remove obstruction on the Fraser

Assessed value of Lower Mainland homes expected to decrease in 2020

Other areas of province may see modest increases over last year’s values

Terrace SAR headquarters in last stretch of fundraising

$400,000 dollars needed to finish $1.4 million project

Chilliwack family’s therapy dog injured in hit and run

Miniature pit bull Fifty’s owner is a single mother facing close to $10,000 in vet bills

Most Read