Skeena Resources, Tahltan prez excited by purchase of Eskay Creek

Skeena gets full control of mine, Barrick gets 12 per cent of Skeena and a one per cent royalty

Skeena Resources and the Tahltan Central Government (TCG) president are excited about a new deal that could advance the reopening of the Eskay Creek gold mine.

The B.C. junior exploration company announced this week it will acquire 100 per cent of the project, which Skeena CEO Walter Coles Jr. described as “the former highest-grade, past-producing gold mine in the world,” from Barrick Gold.

In the deal, Barrick becomes a significant shareholder in Skeena Resources picking up 22.5 million units (each being one common share and one half warrant). The shares give the gold mining giant a 12.4 per cent stake in Skeena. If the company exercises the warrants, that stake goes up to 17.2 per cent.

The deal also gives Barrick a one per cent royalty on the entire Eskay Creek property.

“Skeena is honoured to have Barrick as a significant shareholder as we endeavor to revitalize Eskay Creek,” Coles said, noting the purchase is “an important milestone in the evolution of our company.”

RELATED: Mining supply chain injects $36M into Smithers economy

Since merging with Rangold, Barrick has been looking for ways to leverage its non-Tier One assets. President and CEO Mark Bristow said turning over Eskay Creek to Skeena is a win-win.

“The Skeena team has done a great job on its evaluation of Eskay Creek and this is another good example of a transaction that delivers a value, creating opportunity for all stakeholders,” he said.

The former Eskay Creek mine is located to the west of Hwy 37 halfway between Meziadin Junction and Iskut in the heart of Tahltan country.

TCG president Chad Day said he is excited about the prospect the taking the project to his people.

“It’s going to be interesting for me to go back to the Tahltan Nation and ask them how they feel about the prospect of creating an updated impact benefit agreement with Skeena and basically pitching the prospect of that mine site possibly being open again in the next few years,” he said.

Day said the mine was good for the Tahltan when it operated between 1994 and 2008, with approximately 30 per cent of the workforce being made up of Tahltan members. It provided the direct economic benefit of employment, but also allowed many Tahltan to develop mining expertise, which they have leveraged for opportunities in other B.C. and Yukon mines.

RELATED: Australian mining giant acquires Red Chris mine

He also feels that the TCG is in a much better position today to negotiate given the 2014 Supreme Court of Canada Tsilhqot’in decision — which established Indigenous title extends to all the territory a First Nation regularly and exclusively used prior to Britain asserting sovereignty — and the Province’s implementation of the United Nations Declaration on the Rights of Indigenous Peoples (UNDRIP).

He believes they will be able to work with Skeena.

“We’ve had a pretty good relationship with them, I would say, for about the last four or five years,” Day said, noting Skeena was one of the companies involved in the formation of the BC Regional Mining Alliance two years ago, which includes the TCG, the Nisga’a Lisims Government, the Province and the Association for Mineral Exploration in B.C. (AME), as well as several other companies.

He does not know, however, if the Tahltan people will be on board or whether they will feel like there is already enough mining activity on the territory.

Over its previous lifespan of 14 years as an underground mine, Eskay Creek produced approximately 3.3 million ounces of gold and 160 million ounces of silver.

Based on a 2019 preliminary economic assessment (PEA), Skeena estimates there are still 2.2 million ounces of gold and 53.4 million ounces of silver in the ground, which the company proposes to mine by open pit methods.

The PEA cites “extensive existing infrastructure, including all-weather access roads, previously permitted tailing storage facilities (TSF) and proximity to the recently commissioned 195 MW hydroelectric facilities and linked power grid” as further evidence of the economic feasibility of the project.

The company estimates a mine life of 8.6 years processing 6,850 tonnes of ore per day.



editor@interior-news.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Elena Tran 9, grade five student at Conrad Elementary School learns about Truth and Reconciliation on Oct. 21 with the story of Chanie Wenjack who died at the side of rail lines while fleeing a residential school in 1967. (Photo: K-J Millar/The Northern View)
Conrad Elementary students learn of ‘reconciliACTION’ during Secret Path Week

Secret Path Week from Oct. 17 to 22 commemorates the passing of Chani Wenjack and Gord Downie

More than $10,000 in donations and toys was presented to the Salvation Army by the Prince Rupert Harley riders on Oct. 20, from the 39th annual Toy Ride held on Sept 26. (Photo: K-J Millar/The Northern View)
Harley Riders rode to victory with $10,000 donation to Salvation Army

The 39th annual Prince Rupert Harley Riders gifted more than 280 toys from the annual Toy Ride

The Prince Rupert Port Authority Land Use Plan will guide the growth within lands and waters under its jurisdiction and facilitate Canada’s trade with the world for the next 20 years. (Photo: Supplied by Port of Prince Rupert)
Land Use Plan finalized by Port Authority

PRPA Land Use Plan plan guides the growth and trade for next 20 years within its lands and waters

Such sweetness with all this candy. Dylan Kennedy 7, with his mom Kerri Kennedy volunteer at the Halloween Fest Committee event to bag candy for students in SD 52 on Oct. 19. (Photo: K-J Millar/The Northern View)
How sweet it is

Bags of candy were assembled by more than 25 Halloween Fest Volunteers for distribution to S.D. 52

Ashley Wilson officer in charge of Prince Rupert Marine Communications and Traffic Services said radio officers in Prince Rupert are the eyes and ears of the Canadian Coast Guard with the job as an ocean first responder being like a 911 dispatcher. (Photo: K-J Millar/The Northern View)
Coast Guard calling for radio officers

Deadline for radio officers applications extended specifically for Prince Rupert and area residents

Vancouver police reactivated the search for Jordan Naterer Thursday Oct. 22. Photo courtesy of VPD.
Mom of missing Manning Park hiker believes her son is waiting to come home

‘He’s going to come out of a helicopter and say ‘what took you so long?”

Environment Minister George Heyman, Premier John Horgan and Energy Minister Michelle Mungall announce that B.C. Hydro is proceeding with construction of the Site C dam, Dec. 11, 2017. (Tom Fletcher/Black Press)
Site C actions, costs won’t be known until after B.C. election, Horgan says

Peace River diverted for construction of reinforced dam base

One of the squirrels who ended up having their tails amputated after getting them stuck together with tree sap. (Facebook/Wild ARC)
Squirrels recovering from tail amputation after sap situation near Victoria

BC SPCA Wild ARC says squirrels will be released back into wild, fifth sibling was euthanized

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

More and more electric cars are on the road, but one Chevy Bolt owner was shocked to see how much his BC Hydro bill skyrocketed once he started charging the vehicle. (Black Press file photo)
Lower Mainland man sees significant spike in BC Hydro bill after buying electrical vehicle

An increase should be expected, but Brian Chwiendacz experienced a 200-plus per cent hike

The Anonymous YVR is an Instagram page that reviews restaurants and other establishments around B.C. based on how well they adhere to COVID-19 rules. (Instagram)
Anonymous Instagram page reviews COVID-19 safety measures at B.C. businesses

There are a number of public health orders various types of establishments must follow to slow virus’s spread

Most Read